Arrival and Setting Up Shop
[Home] Up ] [ Arrival and Setting Up Shop ] Fuselage ] Tips ] Control Column Assembly ] Landing Gear ] Seats ] Stabilizer-Elevator ] Rudder-Fin ] Ailerons ] Cabane Struts ] Wings ] Fuel Tank ] Instruments ] Rigging Wings ] Covering ] Painting ] Engine ] Wheel Pants ] Cockpit ] Final Assembly ] First Flight ]

 

Click on the thumbnail pictures to see a larger image.

Biplane021.jpg (31873 bytes)         Biplane022.jpg (29281 bytes)                  

The kit arrived on October 5, 2000, and I pulled it home on my utility trailer. We started unpacking and doing an inventory of the material.

Biplane026.jpg (43128 bytes)         Biplane027.jpg (42650 bytes)

Next I finished setting up my workshop and we built a work table according to plans provided by Murphy Aircraft.

Biplane028.jpg (42616 bytes)                            

Everything was stored away and the jigged fuselage was moved into the workshop.